ABB rapidly mobilized a team to Tumela Mine, replacing critical flood-damaged electrical switchgear in a compressed 10-week schedule to restore Valterra Platinum's production ahead of schedule.
At Pittini Group’s Ferriere Nord steelworks, the customized 850 G processes 600 tons daily, shortens wagon unloading times, and integrates seamlessly with Industry 4.0 telematics systems.
ABB’s upgrade introduces advanced safety systems, power conversion, and digital controls to boost hoist reliability, extend equipment life, reduce downtime, and improve sustainability at Renison Tin Mine.
The newly adopted solutions from ABB improve Sorgenia’s cost management activity and could reduce maintenance costs for certain components in its gas plant by up to 30%.
Ultrasonic simulations enable Baker Hughes to study acoustic wave propagation, which helps in the optimization of transducers used for testing extracted oil and gas.
At Aalen University’s LaserApplicationCentre, IDS industrial cameras enable high-speed, high-resolution observation of PBF-LB/M processes — improving defect detection, material research, and process optimisation.
Featuring the advanced Steam-Ex pretreatment system, the line enables efficient fiber recovery, continuous low-energy operation, and high-yield production of sustainable MDF and HDF panels.
Hywel Griffiths Plant Hire deploys a reinforced CASE CX210E-S with Steelwrist tilt-rotator, Topcon guidance, and wider tracks for precision groundworks.