www.industryemea.com
MEDIAWORLD

First Danieli Bell Annealing Furnaces in Russia, for Nlmk

Two-phase project will heat-treat steel wire coils in nitrogen atmosphere.

First Danieli Bell Annealing Furnaces in Russia, for Nlmk
NLMK Metiz selected Danieli Centro Combustion to supply a new bell annealing furnace installation for the Berezovki facility.

This new system will heat-treat (recrystallize) steel wire coils in 100% N2 atmosphere. The charges will be 21-t coils in seven stacks of three coils each.

The project consists of two phases: In Phase 1, DCC will supply two bases, one heating hood, two inner covers, and one cooling hood. Phase 2 will match the first part of the project.

The furnaces will have a direct coupled base fan; special design diffuser and plenum; hydraulic locking system; and silicon-carbide head burners, each one with its own recuperator.

DCC will supply all mechanical, electrical and automation equipment, and provide technical assistance during erection and commissioning.

www.danieli.com

  Ask For More Information…

LinkedIn
Pinterest

Join the 155,000+ IMP followers