Featuring the Newest Sony Pregius Sensor Generation, Pregius S, the Latest Blackfly S Model Provides Significantly Higher Resolution, Superior Imaging Quality, and Low-Light Performance
Modern electric/electronic systems combine the computing power needed for data-rich applications with the flexibility to improve and evolve during life time by updates and upgrades. PREEvision 9.5 helps you to develop such future-proof E/E systems based on high-performance computers and the AUTOSAR Adaptive platform. With PREEvision, you can easily integrate HPCs and AUTOSAR Adaptive into existing architectures.
Automation and industrial image processing are two fields of strategic importance for Bystronic. The combination of the two technologies is crucial for the optimization of the manufacturing processes of sheet metal processing companies. With its investment in the startup LIP Automation, Bystronic is positioning itself to play an active role in shaping key technologies of the future.
Its market launch will commence in summer 2020. Offer quick and easy access to high quality concrete: The new self-service concrete plant from Liebherr makes this possible. It gives building material suppliers a unique opportunity to supply their customers, such as small professional buyers or DIYers, in a flexible manner. Due to the adjustable concrete discharge, the concrete can be collected by anything from small trailers right up to large truck mixers.
Data centre operators and providers should consider the benefit of critical equipment hire, following multiple reports of disruption and delays of infrastructure projects and to the lead times of vital equipment.
The call came at 4.45 pm on 20 May – the Schmersal Group was officially informed that cyber criminals were planning to launch a targeted attack on the company’s network. The call was verified (it could have been a fake) and it was then down to the IT managers to think fast and take action. Their decision was ultimately to shut down the entire network – a hugely significant action. The connection to the internet was terminated within ten minutes, and within 90 minutes, the entire IT network worldwide was offline. Everything had been disconnected, from the telephone system to the entire ERP system infrastructure, as well as the entire production process and fully automated storage, at all locations.