FLIR will use ITS World Congress 2024 to unveil a groundbreaking advance that has the capability to transform inter-urban traffic flow and road safety in smart cities.
WIKA supports the digitalisation of gas-insulated switchgear with the new model GD-20-W gas density sensor. The wireless device with integrated battery and radio module allows for easy integration into IIoT environments.
The maturity and scale of the European wind turbine fleet presents operators with a challenge: how to effectively improve the performance and value of existing equipment?.
Customers across Europe are set to benefit from enhanced service in the move to become the single-source solution of choice for electronic test equipment.
The gently-curved 3.4 kilometre (2.1 mile) long structure on London’s north-western edge will carry high speed trains running to and from the capital at speeds of up to 320km/h (200mph).
Clashindarroch II Onshore Wind Farm, along with Kemberton Solar Farm will provide around 100MW of new renewables capacity once constructed. This means fossil free power for more than 60,000 British homes.